Welcome to Aichai Baomei Seam Agent--Dongyang Jinzhiyuan Jewelry Co., Ltd.!

金华市金之源新材料有限公司

More than 10 years of brand precipitation

Focus on epoxy resin and peripheral research and development

400-8800-711
News
15 tips in the process of beautiful jointing of tiles
Release time:2020-08-11   Browse:3607

1. Floor heating has no effect on the beauty joints. The high temperature resistance of the beauty joints is 100 degrees Celsius, so even if the floor heating is installed in your home, you can safely make beautiful joints. Just use real porcelain with excellent flexibility and will not cause tile tension. porcelain.

2. The requirements for beautiful seam construction are dry, and dust-free. Many processes in home improvement will generate a lot of dust, such as painting, ceiling, wallpaper and so on. Therefore, the beauty joint construction time is before these dust-prone processes. Otherwise, there will be too much dust in the gap, and it will be troublesome to clean up, and the construction effect will not be good.

3. The beauty joint agent should be stored in a cool, dry and ventilated warehouse at 5℃-35℃, and the construction temperature should be within the range of 15℃-30℃. If the temperature is too low, it will hinder the loss of water and solidification of the material due to slow evaporation of water or freezing; if the temperature is too high, the solidification effect will be affected due to the fast evaporation of water.

4. Beautiful seam agent must use seam wax or paste seam paper on antique tiles. Because the surface of antique bricks is hard to clean after curing. The time to tear the seam paper is very important. After the seam agent is smoothed, it should be torn off immediately. Friends who use beautiful seam wax can omit this step and only need to put the beautiful seam wax on the edge of the gap to achieve the same effect.

5. If you find that the product is difficult to produce, you might as well soak the product in warm water for half an hour before using it. After the product is taken out of the water, wipe the appearance clean before using it to avoid dripping into the cracks and affect the construction effect.

6. After cleaning the tile gap, use a vacuum cleaner to clean the gap again. Then, wipe the gap and both sides with a semi-dry towel, and then start construction.

7. In the process of cleaning tile gaps, use a brush to clean up the dust. When the brush is cleaning dust, it must follow the gap, sweep to both sides, and then gather it together to clean it up.

8. Before punching the material of the beautiful sewing product, be sure to punch out about 30cm of material and discard it, and then drive it into the gap. When a set of products is finished, when replacing a new product, the mixing tube must be replaced with a new one. At the same time, the 30CM material at the front end must be discarded.

9. When performing seaming work, whether using a seaming ball, a seaming rod, or a squeegee, after pressing the seam once, wipe the seam-beauty agent on the seam ball or the squeegee clean, and then Return to the gap for a second press.

10. The punching is done in a straight line shape. For the places that are not hit or not full, you must re-punch. If you hit too much material, you can clean up, but if there is less material, there will be gaps or failures. Leveling will affect the construction effect.

11. For the beautiful seam treatment of tile gap intersections or T-shaped intersections, first press in one direction, and then place the steel ball in the center of the cross angle to press in the other direction respectively. When the steel ball is started, the handle angle is increased and the lifting is accelerated. Reduce the concavity of the joint at the start of the steel ball.

12. After the seam and seam are all finished, the site must be protected before it is completely cured. Do not step on the seam at will, let alone step on the finished seam, otherwise you will have to clean up and re-construct.

13. The curing time of beautiful sewing products is affected by environment and temperature. The normal curing time is about 6-8 hours for early drying in summer and about 10 hours for early drying in winter. But it will cure within 24 hours normally. Therefore, the remaining material should not be cleaned for more than 24 hours.

14. If there is still part of the two-component beauty joint agent that does not dry after 24 hours, the main reason is that the epoxy resin and the curing agent are not completely mixed, causing it to not dry. Generally, there is no need to wait in this case, because this This situation is impossible to dry any more, you can only pick up the un-done and re-apply. This is a normal phenomenon of two-component beauty joint agent. It is recommended not to finish the construction at one time, leaving some remaining material for repair.

15. Make the tile joints for beautiful seams and take care of them in life. Do not poke with sharp objects and avoid strong acid and alkali substances, otherwise it will destroy the components of the seam and affect the service life of the seam.